Prepared the initial feasibility study for a new Order Entry/Billing/Promotions System. Functioned as Project Manager of a seven-person team for the Functional Systems Design phase of this 2-3 year project. The system was designed with Shared Corporate Databases using ADR Datacom/DB. The design process utilized the Method/1 development methodology and Data Modeling and Data Flow techniques using Excelerator/PC computer aided design software. It also included prototyping, using ADR/Ideal. The result of the Functional Design was a 700-page document that contained the specifications of the system.